Common foundation: different roads to the same goal
IWS was not created in opposition to Lean; it is rather its evolutionary adaptation, filtered through the experience of the FMCG industry and the Total Productive Maintenance (TPM) methodology developed by the Japan Institute of Plant Maintenance (JIPM).
Both systems rest on a few inviolable pillars:
- Approach to losses: Lean focuses on eliminating the 8 types of waste (Muda), while IWS strives for an absolute state of Zero Loss (zero breakdowns, zero defects, zero accidents, zero speed losses).
- Work standardisation: Standardised work in Lean corresponds in IWS to rigorous Centerline procedures (machine parameterisation) and CIL procedures (Clean, Inspect, Lubricate).
- Solving problems at the source: The use of structured tools aimed at reaching the root cause (5-Why, Ishikawa diagram and A3 reports in Lean; the Problem Solving methodology in IWS).
- The role of Gemba: In both cases the managerial centre of gravity is on the shop floor, with the direct involvement of operators.
Key differences: Automotive vs. FMCG
The biggest divergences stem from process specifics. Lean was born in discrete manufacturing (car assembly), where flow, takt and lead time are key. IWS emerged in the highly automated continuous and high-speed packaging industry (consumer goods), where the reliability of machine parks and the elimination of micro-stops are crucial.
| Feature / Area | Lean Manufacturing (TPS) | Integrated Work System (IWS – P&G) |
|---|---|---|
| Main origin | Toyota – automotive industry (discrete manufacturing) | Procter & Gamble – FMCG (continuous and high-speed packaging production) |
| Main focus | Flow, Pull system, shortening lead time | Equipment reliability (OEE), Zero Loss, human capability |
| Main mapping tool | Value Stream Mapping | Financial and operational Loss Tree |
| Engagement architecture | Kaizen culture, quality circles, team engagement | HPWS (High Performance Work Systems) + 100% Total Involvement |
| Implementation structure | Often flexible, oriented towards principles and culture | Rigorous 5-phase maturity model with certification audits |
| Daily operating rhythm | Standardised briefings, Visual Management boards | Codified Daily Management Systems (DMS: DDS, CIL, Centerline) |
What sets IWS apart? Three unique P&G elements
1. Integrating TPM with HPWS (sociotechnical systems)
While many Lean implementations struggle with a lack of full operator engagement, IWS combines technical requirements (TPM) with organisational ones (High Performance Work Systems) from day one. The premise is unambiguous: 100% of employees must be 100% engaged in eliminating losses. The operator does not merely run the machine – they become its micro-owner (Autonomous Maintenance).
2. A Loss Tree instead of gut feeling
In IWS no improvement project is launched without a hard financial justification. The Loss Tree precisely converts every second of line stoppage, every gram of scrap and every kilowatt-hour into concrete amounts. The IWS pillars respond directly to the largest “branches” of loss in the plant.
3. Codified Daily Management Systems (DMS)
IWS turns Lean concepts into repeatable, daily organisational habits. Every shift runs the same management loops:
- DDS (Daily Direction Setting): A 15-minute team meeting analysing the last 24 hours and setting priorities for the next 24 hours on the basis of hard indicators.
- Centerline (CL): Keeping process variables within strictly defined technological windows, eliminating product variability and micro-stops.
- CIL (Clean, Inspect, Lubricate): A cleaning standard combined with inspection that detects micro-faults before they turn into a breakdown.
Implementation practice: how to build synergy?
Today’s world-class factories rarely choose a pure, uniform doctrine. The most effective strategy combines the philosophy and flow dynamics of Lean Manufacturing with the operational rigour and technical reliability of IWS.
- If the problem is long changeover times, high work-in-process inventory and slow flow, the Lean toolkit (SMED, VSM, Kanban) will deliver the fastest results.
- If the plant struggles with high process variability, frequent machine breakdowns and a lack of execution stability across shifts, the IWS methodology with its TPM pillars and DMS rigour is the first-choice solution.
The synergy of both worlds creates a complete operating system: Lean defines what and why should be improved in the value stream, and IWS provides the execution engine that ensures the achieved parameters are maintained permanently.
The success of implementing both Lean Manufacturing and the Integrated Work System (IWS) depends on efficiently transforming theoretical concepts into lasting habits on the shop floor. Our company is the physical link between strategy and Gemba practice, supplying the right equipment and the tools needed to parameterise and stabilise processes.
In the Lean context, 4Lean solutions – dedicated line equipment, transport carts, Kanban boards and shadow boards (5S) – create the material foundation for smooth operation and the elimination of waste. In an IWS environment, in turn, the company’s offering directly supports the operationalisation of the key Daily Management Systems (DMS): from ergonomic DDS (Daily Direction Setting) briefing boards and Loss Tree visualisation points, through mobile cleaning and inspection (CIL) stations, to standardised Centerline parameter recording boards right at the machines. By supplying durable, flexible components tailored to the specifics of the plant, 4Lean shortens the time needed to implement standards, strengthens visual discipline and makes it easier to build a culture of 100% operator engagement in maintaining the production infrastructure.